Correct installation and application of electromagnetic flow

Installation of electromagnetic flow meter

It is important to ensure the accuracy of the electromagnetic flow meter.

In order to ensure that the transmitter measuring tube filled with the measured medium, the best vertical installation, flow from bottom to bottom, especially for liquid and solid two-phase flow, must be vertical. If the site only allows horizontal installation, it must ensure that the two electrodes in the same horizontal plane

The transmitter should be installed in the indoor dry and ventilated place, avoid the installation in the environment temperature is too high, should not be strong vibration, as far as possible to avoid strong magnetic field equipment, such as large motor, transformer and so on.

Measured by the electromagnetic flow transducer electrode of a few millivolts AC voltage is to document.write ('') transmitter document.write ('') liquids the potential for foundation. In order to make liquid stable potential and transmitter and maintaining a fluid potential, in order to ensure stable are measured, the transmitter shell and the metal pipe ends should be well grounded, the converter shell should be grounded. Grounding resistance cannot be greater than 10, and other electrical equipment connected a common ground wire. If the transmitter housing is not guaranteed to be in good contact with the metal pipe, the metal conductors are used to connect them.

The transmitter should be installed at both ends of the valve and bypass.

Fifthly, in order to avoid signal interference and document.write ('') transmitter document.write ('') and a converter between the signal must be shielded wire transmission is not permitted. The signal cables and power lines parallel placed in the same cable pipe. Signal cable length shall not be more than 30 m.

The converter in installation site of avoiding, DC magnetic field and vibration, ambient temperature of - 20 to 50 DEG C, does not contain corrosive gases, relative humidity is less than 80%.

Seventhly, in order to avoid the velocity relative measurement, the flow control valve should be set in the downstream of the transmitter. For small caliber document.write ('') transmitter document.write (''), because the distance from the center electrode to the flow meter inlet has equivalent to several times the diameter D of length, so the upstream pipe can not. But to a larger diameter flowmeter, general upstream above should be 5D straight section downstream generally do not straight sections requirements


Top
主站蜘蛛池模板: 精品无人乱码一区二区三区 | 国产av巨作情欲放纵无码 | 国产一区二区三区内射高清 | 国产一区二区精品高清在线观看 | 亚洲精品国产第一综合99久久 | 日韩精品一级毛片免费 | 欧美人与动牲交a欧美精 | 国产主播勾搭在线观看 | 青青久久中 | 日本在线a∨视频网 | 亚洲欧美一级 | 不卡国产精品欧美一区二区 | 亚洲精品乱码久 | 欧美淫乱国产精品一区二区 | 日本精品久久久久久一区二区三区 | 岛国无码av潮喷 | 国产成人亚洲日韩欧美全集 | 人人爽人人爽人人片av高清 | 日韩中文字幕 | 91精品国产综合久久久久久久 | 无码在线观看三级高清 | 欧美精品国产第一区二区 | 中文字日产幕码三区的做法 | 精品人妻无码一区二区色欲产成人 | 日本成人黄色大 | 国产在线欧美精品中文一区 | 国产麻豆一精 | 伊人2222| 亚洲国产午夜精品理论片在线播放 | 日本丰满妇人成熟免费中文字幕 | 91人人妻人人做人人爽 | 精品人妻无码一区二区色欲产成人 | 亚洲人成在线观看一区二区 | 综合影院 | 精品日韩欧美一区二区 | 欧美大胆作爱视频 | 真实国产日韩欧美全部综合视频 | 国产中文字幕在线观看 | 久久国产成人午夜av影院 | 婷婷久久精品人人做人人爽播放器 | 亚洲v天堂v手机在线观看 |